国产精品免费久久久久影院 I 日韩福利一区二区三区 I 国产乱人伦av在线a I 黄色小说内容 I 亚洲成av人在线视猫咪 I 97在线观看永久免费视频 I 95久久 I 成年免费视频播放网站推荐 I bdsm在线观看播放视频 I 最新婷婷色 I 美国三级 I 无码精品在线视频 I 国产精品高潮呻吟久久a I 美女激情自拍 I 日本在线网站 I 日韩激情在线 I 国产亚洲一区精品 I 茄子视频A I 黄色污片在线观看 I 亚洲激情图片小说视频 I 把女邻居弄到潮喷的性经历 I 国产亚洲一区二区三区四区 I 欧美性大战 I 波多野结衣国产视频 I 美女张开双腿让男人捅 I 最新中文字幕2019 I 色av免费 I 黄色小说视频图片 I 亚洲精品成人一区 I 女子口述spa做爰全过程 I 操操操操操操操 I 国产精品一区二区久久毛片 I 在线免费播放 I www.狠狠插 I 久草免费在线色站 I 极品粉嫩福利午夜在线播放 I 精品亚洲卡一卡2卡三卡乱码 I 国产亚洲精品久久网站 I 亚洲二区自拍 I 久久久日韩影视噜噜 I 天天躁狠狠躁日日躁黑人 I 欧美,日韩,中文字幕 I 永井玛利亚 精品 国产 一区 I 大胸美女av I 色综合久久88色综合天天6 I 伊人久久一区 I 在线观看的av网址 I 国产黄色在线免费看 I 色极影院 I 宝贝调教hhhh I 三区中文字幕 I 黄色大全免费看 I 亚洲va无码专区国产乱码 I 草莓视频污版在线观看 I 999久久a精品合区久久久 I 少妇献身吴上进杨雨婷 I 一本丁香综合久久久久不卡网站

Graphite hot field vacuum debinding and sintering furnace 480-S

Our Products

Less area occupancy

  1. Reduce the occupation area by 30% .
  2. Placing heat transformers on the top of furnace body and designing pipeline and pump sets as a whole.

Binder trap

  1. Three grade binder trap design. More efficient.
  2. First grade is stainsteel,second grade is aluminum, third grade is copper.

Data Viewer

  1. Self-developed computer software
  2. Develop “Data viewer“ in computer to check the curve run of the furnace .easy to move, print and zoom to track on malfunctions.

High precision gas control

  1. Mass flow controller can automatic adjust flow according to the process setting, avoid unstable air intake flow(fluctuation ratio of 20~50%) due to the change of parameter such (e.g pressure) when using rotor flow meter.
  2. Gas flow can be set continuously according to process steps.
  3. Two alarms outputs (Warning and action) for each process gas.
  4. Devices to maintain pressure stabilization in pipeline,so as to prevent process gas leakage, backflow and mix up.

Partial pressure control

  1. Deploy Siemens electric proportional controller to automatically regulate pressure inside the furnace according to process parameters,to avoid the fluctuation, area pressure difference, valve leakage, etc. when using open-shut type of control.
  2. The pressure can be set continuously according to process steps.

Optimized cacuum pipeline

  1. Deploy binder collecting-pot with front opening-door, for easy binder and seal cleaning to reduce leakage, and design without plug-in and pull-out cable for heating.
  2. Low position of pipeline ,for convenient cleaning and maintenance.

Fast force cooling

  1. Added built-in copper cooler in the back door.
  2. The cooling fan is changed from 2.2kW to 7.5KW (15kW).
  3. The cooling time of unloaded furnace improved by more than 60%.
  4. The cooling time of loaded furnace improved by more than 50%.
  5. By using loaded furnace and controllable cooling cooperatively, the actual whole production cycle time can be reduced by 15~25%.

Wide directional gas flow

  1. Refined gas flow, there are many holes in the door face to the shelves, the gas from holes flow into the retort.
  2. The gas can flow through the product uniformity, forming positive flow no matter in debinding or partial pressure process.
  3. With independent air intake for each shelf, to guide the gas uniformity into each shelf.
  4. With equally-distributed air inlets and pipeline spreader plates, ensuring the wide cut of gas.
  5. The gas is fed into the furnace first, and then flows through the inlet valve at the graphite seal box door and the diversion branch, as well as the inlets to flow into the seal box evenly.

Innovate high seal retort

  1. Innovative design, to avoid malposition of graphite box in the long term.
  2. Upside down type integrated design of the seal box door, and the door with two bolts structure.
  3. Debinding pipeline with anti leakage ring.

Our advantage

Precise control

With more than ten years of experience in sintering furnace design, he has a very deep understanding of vacuum, temperature control and air flow, and has a complete set of systems for testing to achieve world-leading temperature control, air flow control and vacuum control.

Full size

HIPER MIM sintering furnace is rich in variety and complete in variety, covering all equipment from experiment to mass production, and then to mass production, meeting the needs of customers at different stages.

Quick service

With more than ten years of after-sales service experience, we can find and solve problems in a short time, and send after-sales parts quickly.

Rich customization

Hengpu can customize professional sintering furnaces according to your materials, application fields, and usage scenarios, and can also choose different configurations based on our standard furnaces.

Contact Us

China Business Department: Mr. Zhou

Mobile: 13586786142

E-mail: bin.zhou@hiper.cn

South China Division: Mr. Xiang

Mobile: +86-15990511581

E-mail: wei.xiang@hiper.cn

海外事業(yè)部:鄒先生

手機:+86-15888582526

郵箱:songting.zou@hiper.cn

In case of any problem, HIPER welcomes your call!

Graphite hot zone debinding and sintering vacuum furnace has the functions of debinding and sintering in one, and is used for thermal debinding and sintering of metal powder injection molding products.

Thanks to the operation experience of more than 1,000 graphite furnaces of Hengpu in the metal powder injection molding industry, we truly understand the needs of customers, and constantly innovate technologies according to customer needs, maintain customer competitiveness, and continue to create value for customers.

Suitable material:

鈦合金,鐵鎳合金,大部分不銹鋼(17-4ph,316L,PANACEA等)

石墨熱場真空脫脂燒結(jié)爐480-S
  • Temperature control areaZone 2
  • Intake methodPartial pressure valve intake
  • Special processNone
  • Processing box size (cm)48/48/200
  • Sheet quantity (pcs)40
  • Maximum temperature (°C)1600
  • Operating temperature (°C)1500
  • Temperature distribution (°C)≤8
  • Ultimate vacuum (Pa)0.7
  • Power capacity (KVA)200
  • Used gasN2,Ar
  • Site requirements (m3)3.6×4.6×3.1
主站蜘蛛池模板: 黑龙江省| 平塘县| 房产| 尚志市| 浪卡子县| 拉孜县| 滨州市| 永昌县| 阿巴嘎旗| 资源县| 玉屏| 南平市| 北碚区| 新兴县| 凯里市| 秦安县| 唐海县| 阿拉善盟| 凉山| 东明县| 新民市| 五寨县| 绍兴县| 赣榆县| 乌拉特中旗| 德清县| 平陆县| 恭城| 江达县| 张家界市| 西昌市| 诸城市| 军事| 铜陵市| 通化市| 开阳县| 呼和浩特市| 郑州市| 祁阳县| 景洪市| 定安县|